Descargar Imprimir esta página

Installation Instructions - Fortis BRERA 9269100 Manual Del Usuario

Publicidad

Idiomas disponibles

Idiomas disponibles

English

INSTALLATION INSTRUCTIONS

Water Supply
Recommended
Maximum
Hot Water Temperature
65 C° (~150F)
80 C° (~175F)
Working Pressure
3 BAR (~45PSI)
5 BAR (~75PSI)
In case of pressures over 5 BAR (~75 PSI), we
positioning hole with the housing of the fitting
recommend to use a pressure reducer.
screw (4.E), then tighten the latter.
Warning! Do not force the screw (4.E). Excessive
Before proceeding with the assembly, purge the
hot and cold water pipes so as to avoid the
tightening can affect the correct function of the
accumulation of dirt and impurities that could
system or damage it. The thermostatic cartridge
affect the function of the faucet.
is equipped with a safety anti-scalding retainer
set at 100°F (38°C). For higher temperatures
FIG. 01
push the button on the adjustment handle. In
Remove the protection covers (1.A) using a
case of hot or cold water pressure failure, the
screwdriver. Use the plug (1.B) if necessary.
flow will automatically stop. With a screwdriver
loosen the stop cocks (4.F) in anti-clockwise
FIG. 02
direction.
Fit the faucet body (2.A) to the wall with the
two upper outlets pointing towards the flow
FIG. 05
elements. Connect the hot water supply to the
Remove the protection tape of the adhesive
left inlet and the cold water supply to the right
sponge (5.D) and apply it on the back of the
one.
plate (5.C). Fit the sliding flat washers (5.B) and
(5.A) on the plate (5.C) and install it on the
FIG. 03
thermostatic body till it is flush to the wall.
The depth of the wall niche must correspond
(wall coating included) to the tolerance given
FIG. 06
by the MIN/MAX references given on the
Control handles installation.
plastic cover (3.A).
For the upper portion with the diverting
Once all connections have been carried out,
cartridge, follow the instructions given below:
activate the faucet at the working pressure
Fit the spacers (6.P-6.O) on the bar of the
(we recommend maintaining the water flow
cartridge, screw on the protection cylinder
for a few minutes so as to purge the system
(6.N), install the insert (6.M) and fasten with
from any debris and/or dirt inside the piping).
the included screw (6.I) placing the spacer in
Temporarily remove the protection cover (3.A)
between. Fit the handle (6.F) and tighten the
to check if there are leakages and if the system
grub screw (6.G). Complete by positioning the
works regularly, reinstall the protection cover
finishing cap (6.H). For the lower portion with
(3.A) and finish the external wall surface.
the thermostatic cartridge, follow the instructions
given below: fasten the peg (6.E) on the bar of
FIG. 04
the thermostatic cartridge and install the handle
Remove the protection cover (3.A) as shown
(6.A) putting the ring (6.D) in between without
in FIG. 03. With a screwdriver fasten the stop
moving the bar so as to not compromise the
cocks (4.F) in clockwise direction, loosen the
cartridge calibration. Tighten the grub screw
fitting screw (4.E) using the proper wrench
(6.B) and place the finishing cap (6.C).
and pull out the test plug (4.D). Insert the o-ring
(4.C) and the sleeve (4.B) on the thermostatic
FIG. 07
body. Use a small quantity of the special grease
To replace only the handle (7.A) follow the
included to lightly lubricate the o-rings of the
instructions given below:
thermostatic cartridge (4.A). Insert the cartridge
Remove the cap (7.C), loosen the grub screw
in the faucet housing carefully aligning the
(7.B) and pull out the handle (7.A).
FIG. 01
Minimum
15 C° (~60F)
0.5 BAR (~7PSI)
FIG. 03
FIG. 05
FIG. 02
FIG. 04
FIG. 06
FIG. 07
FIG. 08

Publicidad

loading