Important; Starting The Engine; Connecting Electrical Loads - Briggs & Stratton ELITE Serie Instrucciones De Uso

7500w
Ocultar thumbs Ver también para ELITE Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

WERPRODUCTS
OPERATING
THE
GENERATOR
CAUTION
. See"Don't Overload Generator".
. Start generator and let engine stabilize before connecting
electrical loads.
. Connect electrical loads in OFF position, then turn ON for
operation.
. Turn electrical loads OFF and disconnect from generator
before stopping generator.
IMPORTANT:
Always unplug the batter), float charger
before starting the generator.
Starting
the
Engine
Disconnect
all electrical
loads from the generator. Use the
following start instructions:
1.
Make sure unit is on a [eve[ surface.
iMPORTANT:
Failure to start and operate unit on a level
surface wii[ cause the unit not to start or shut down during
operation.
2.
Turn the fuel valve to the"On"
position (Figure 5).The
fuel valve handle should be vertical (pointing toward
the ground) for fuel to flow.
FuelValve is shown
in the On position
3.
Start engine according to instructions
given in the
engine owner's manual.
NOTE:
[f engine starts after 3 pulls but fails to run, or if
unit shuts down during operation,
make sure unit is on a
level surface and check for proper oil level in crankcase.
This unit may be equipped with a low oil protection
device.
See engine manual.
WARNING
When
starting engine, pull cord slowly until resistance is felt
and then pull rapidly to avoid kickback.
NEVER start or stop engine with electrical
devices plugged in
and turned
on.
WARNING
DO NOT touch hot surfaces.
Allow equipment to cool before touching.
The generator must be at least 5 feet from structures having
combustible walls and/or other combustible materials.
Keep at least 3 feet of clearance on all sides of generator for
adequate cooling, maintenance and servicing.
[n the State of California a spark attester is required by law
(Section 4442 of the California Public Resources Code). Other
states may havesimilar laws. Federal laws apply on federal
lands.[f you equip the muffler with a spar[<attester, it must be
maintained in effective working order.
Connecting
Electrical
Loads
• Let engine stabilize and warm up for a few minutes after
starting.
• Plug in and turn on the desired 120 and/or 240 Volt AC,
single phase, 60 Hz electrical
loads.
• DO NOT connect 240Volt
loads to the [20Volt
duplex
receptacles.
• DO NOT connect 3-phase loads to the generator.
• DO NOT connect 50 Hz loads to the generator.
• DO NOT
OVERLOAD
THE
GENERATOR.
See
"Don't
Overload
Generator".

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

030210

Tabla de contenido