Symmons Identity 6706 Manual De Operaciones Y Mantenimiento página 5

Ocultar thumbs Ver también para Identity 6706:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
9) Place mounting plate (C) in po-
sition, mark and drill 3/16" holes
for tile anchors (U1), 5/16" holes
for drywall anchors (U2). Install
anchors.
U1
U2
C
U2
Note: For dry wall 1/2" thick or less,
insert anchor tool (U3) into drywall
anchor (U2) to secure behind wall
prior to installing wall cradle.
Operation (Temperature Control)
1) Turn shower handle counter-
clockwise approximately 1/4 turn
to put valve in cold position.
10) Remove cover of hand show-
er cradle (E). Install cradle and
mounting plate (C). Secure with
three screws (F). Replace cover
on hand shower cradle.
U3
2) Turn shower handle counter-
clockwise approximately 1/2 turn
to put valve in warm position.
E
C
F
5
11) Attach vacuum breaker (G) to wall
ell (B). Attach hose (H) to vacuum
breaker. Attach hand shower (A)
to hose (H). Turn clockwise to
tighten.
3
B
1
G
2
H
5
12) Install tub spout (T) to pipe fitting
Turn clockwise to tighten.
T
3) Turn shower handle counter-
clockwise approximately 3/4 turn
to put valve in hot position.
A
4
H

Publicidad

Tabla de contenido
loading

Tabla de contenido