Pre-Installation Information - Bradley S19-671HR Manual Del Usuario

Camisa calentadora para el tanque de 5 galones
Ocultar thumbs Ver también para S19-671HR:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

S19-671HR
Disconnect before servicing. Inspect cord for fraying. Make sure there is no visible damage to the
yoke's electrical system
Failure to lift unit by the provided handles may damage unit.
Read this installation manual completely to ensure proper installation, then file it with the owner or
maintenance department. Compliance and conformity to drain requirements and other local codes
and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding any
packaging material. If any parts are missing, do not begin installation until you obtain the missing
parts.
Workers who may come in contact with potentially hazardous materials should be trained
regarding the placement and proper operation of emergency equipment per ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly to verify proper
operation. This equipment should be inspected annually to ensure compliance with ANSI Z358.1.
This unit is to be used with tepid, potable water as defined by ANSI Z358.1. (Note: avoid prolonged
exposure to ambient heat sources above 100° F, or below 60° F).
For questions regarding the operation or installation of this product, visit www.bradleycorp.com or
call 800.BRADLEY (800.272.3539).
Product warranties and service parts information may also be found under "Products" on our web
site at www.bradleycorp.com.
Supplies and Tools Required
• Pipe sealant
• Air pressure equipment or supply (clean and free of oil and contaminants) capable of up to 100 psi .
• Sign-mounting hardware
• Philips-head screwdriver
• Adjustable wrench
2
CAUTION
.
NOTICE
IMPORTANT
9/10/2018
Bradley • 215-1748 Rev. C; ECN 18-05-033
Installation

Publicidad

Tabla de contenido
loading

Tabla de contenido