SECTION 3
Amps
Notes:
• Pilot Arc Set to LOW when applicable.
• Cutting with 100 amp nozzle, use P/N 0558005306
• Up to 0.50 inch thick material use Gas Baffle 4 Hole P/N 0558002533, Reverse 4 hole P/N 0558002534
• Mixer required for this process.
PT-600
Process Data
IN
MM
Rise On Pierce
Pierce Delay
Auto Height Delay
22psi @ 75cfh
Plasma Start Gas
(N
)
1.5bar @ 2.2cmh
2
45psi @ 110cfh 45psi @ 110cfh
Plasma Cut Gas
(O
)
3.1bar @ 3.1cmh
2
20psi @ 37cfh
Shield Start Gas
(N
)
1.4bar @ 1.0cmh
2
20psi @ 37cfh 15psi @ 30cfh
Shield Cut Gas 1
(N
)
1.4bar @ 1.0cmh 1.0bar @ 0.8cmh
2
100psi @ 115cfh
Shield Cut Gas 2
(O
)
6.8bar @ 3.2cmh
2
IN
Initial
Height
MM
Arc Voltage
(standoff)
IPM
MM/MIN
Inches
Millimeters
Amperes
.188
.250
4.78
6.35
0.0
0.0
0.1
0.1
0.2
0.2
22psi @ 75cfh
1.5bar @ 2.2cmh
3.1bar @ 3.1cmh
20psi @ 37cfh
1.4bar @ 1.0cmh
100psi @ 115cfh
6.8bar @ 3.2cmh
.250
.250
6.35
6.35
133
130
100
84
2540
2135
.078
.078
2.0
2.0
90
90
24
OPERATION
70 / 110 Amperes
Carbon Steel
Precision
.312
7.92
0.0
0.1
0.2
22psi @ 75cfh
1.5bar @ 2.2cmh
45psi @ 110cfh
3.1bar @ 3.1cmh
20psi @ 37cfh
1.4bar @ 1.0cmh
15psi @ 30cfh
1.0bar @ 0.8cmh
100psi @ 115cfh
6.8bar @ 3.2cmh
.250
6.35
133
70
1780
.086
2.2
90
16
DEC
05 Revision