INSTALLATION
Typical Installation
Typical Installation
1. Gate Valve
2. Check Valve
3. Union
6
8
12
4. Switch Power
7. Discharge
5. Pump Power
8. Gas Tight Basin
6. Vent
9. Intake
5
4
3
7
10
11
10. Caulking Hub
11. 3/16
12. Tethered Float (refer to the
Specifications tables for ON-OFF levels)
INSTALLATION
Typical Installation
2
1
9
"
Air Bleed Hole
5