Pre-Installation Checklist; Preparing The Opening - GE CP650 Instrucciones De Instalación

Ocultar thumbs Ver también para CP650:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PRE-INSTALLATION CHECKLIST

WARNING –
the cooktop supply line must be shut off while
connections are being made. Failure to do so
could result in serious injury or death.
When preparing cooktop opening, make sure
A
the inside of the cabinet and the cooktop do
not interfere with each other. (See section on

preparing the opening.)

Remove packaging materials and literature
B
package from the cooktop before beginning
installation.
Foam
Packaging
Cooktop
PREPARING THE OPENING
1
The following MINIMUM clearance dimensions
must be maintained.
13" MAX. Depth of unprotected
overhead cabinets
30" MIN.
Clearance from
countertop to
unprotected
overhead
surface
2" MIN. Clearance
from cutout to side
wall on the left of
the unit
If a 30" clearance between the cooking surface and
overhead combustible materials or metal cabinets
cannot be maintained, a minimum clearance of 24"
is required and the underside of the cabinets above
the cooktop must be protected with not less than
1/4" insulating millboard covered with sheet metal
not less than 0.0122" thick.
Installation Instructions
The electrical power to
Literature
Package
2" MIN. Clearance
from cutout to
side wall on the
right of the unit
15" MIN. Height
from countertop to
nearest cabinet on
either side of unit
Remove Installation Instructions from
C
literature pack and read them carefully before
you begin.
Be sure to place all literature,
Owner's Manual, Installations,
etc. in a safe place for future
reference.
D Make sure you have all the
tools and materials you need
before starting the
installation of the cooktop.
Your home must provide the adequate
E
electrical service needed to safely and
properly use your cooktop. (Refer to section on
electrical requirements.)
When installing your cooktop in your home,
F
make sure all local codes and ordinances are
followed exactly as stated.
G Make sure the wall coverings, countertop and
cabinets around the cooktop can withstand
heat (up to 200°F) generated by the cooktop.
2 OVERALL COOKTOP DIMENSIONS
36"
(36-1/8" SS)
Cooktop
18-7/8"
3 VERTICAL CLEARANCE
Allow 5" minimum
vertical clearance
from the cooktop
bottom (or 8-1/4"
minimum depth from
the countertop) to any
combustible surfaces,
such as a cabinet
drawer.
3
20-7/8" (21" SS)
Depth on Monogram ZEU36K
is 21-1/4' @ center.
3-1/4" Front
4-3/16" Rear
at the conduit
location
6-1/4" Rear
33-3/4"
on Model PP975 &
PP980
8-1/4"
5"
DRAWER

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Jp655Jp656Pp962Pp972Pp975Pp980 ... Mostrar todo

Tabla de contenido