Probe And Bulb Positioning - Ferroli TP3 COND Serie Manual De Instalación, Uso Y Mantenimiento

Caldera por condensación de altísimo rendimiento presurizada de acero
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

TP3 COND 65 ÷ 1000

5.9 Probe and bulb positioning

The control panel is equipped with a temperature probe and three bulbs.
There are two wells "a" and "B" near the heating delivery "T1" (see Fig. 15).
IT IS MandaTorY to insert in the well "a" (Fig. 17) the temperature probe "4" and the safety thermostat bulb "3".
Insert in the well "B" (Fig. 16), the bulb of the 1st stage thermostat (1) and that of the 2nd stage thermostat (2).
Make sure the probe and bulbs reach the end of the sheath.
Place the capillaries of the bulbs and probe as shown in Fig. 18.
B
T1
fig. 15 - Probe and bulb wells
legend
1
Thermostat bulb 1st Stage
2
Thermostat bulb 2nd Stage
3
Safety Thermostat bulb
4
Temperature probe
IMPorTanT
To InSTall anoTher TYPe of TeMPeraTure conTrol, IT IS neceSSarY To uSe and InSTall (aS PrevIouSlY de-
ScrIBed) a SafeTY TherMoSTaT coMPlYInG WITh The currenT reGulaTIonS, WITh InTervenTIon TeMPeraTure
(SWITchInG PoInT) = 110-6°c.
A
cod. 3541T740 - Rev. 04 - 10/2019
fig. 16 - Well B
fig. 18
fig. 17 - Well a
EN
65

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tp3 cond 65Tp3 cond 100Tp3 cond 150Tp3 cond 230Tp3 cond 370Tp3 cond 500 ... Mostrar todo

Tabla de contenido