Pentair MYERS HJ Serie Manual Del Usuario página 6

Bombas de chorro
Ocultar thumbs Ver también para MYERS HJ Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Fuse box or Circuit breaker
Pressure Gauge
(Purchase Separately)
Copper electric wire with ground
Discharge Tee
Shallow Well
Convertible
Figure 1 - Typical Shallow Well Pump Installation
Well Point Installation
If installing a well point instead of a foot valve, follow
the instructions included with the well point. In addition:
a. Do not install a well seal
b. Install the two check valves: one on the well side of
the pump; one on the house side.
Step 7
1-1/4" PVC Adapter
Step 5
Venturi
Nozzle
Shallow Well Ejector
Step 4A
Step 4
1-1/4" rigid PVC Pipe
1-1/4" PVC Elbow
Well Seal
1-1/4" rigid PVC Pipe
1-1/4" PVC Adapter
Step 6
1-1/4" PVC Adapter
1-1/4" Foot Valve
6
Check Valve
1-1/4" Elbow
Step 3
1-1/4" Galv.
Pipe
Well Point
Step 2
Step 1
6513 0312

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Myers hr serie

Tabla de contenido