Terminal Connections; Testing The Conversion - Eaton LVLD Serie Manual Del Usuario

Tabla de contenido

Publicidad

the light fitting).
All metal work within an earthed fitting
MUST be securely earthed, including
reflectors and louvers.
Keep cables as short as possible.
Mains wiring must exit fitting from nearest
entry/exit point.
Keep mains wiring away from the LED lamp
cables for better EMC performance.
In SELV conversion applications keep
mains wiring separated from the battery,
LED lamp and indicating LED wiring or use
special (double insulated) wiring.

TERMINAL CONNECTIONS

Connect the neutral to 'N' terminal of the
converter and to the mains LED driver neutral
input terminal. Connect the unswitched
live to terminal 'L ' and the switched live in
terminal 'L1 In' on the converter. Connect
converter's 'L1 OUT' terminal to the mains
LED driver live input terminal.
Connect the yellow/white or red/brown LED
wire to the terminal marked 'LED Y'/'LED
W' or 'LED R'/'LED B' respectively.
Connect the two cables for the telelcommand
signal on the '-A'/'+B' terminal blocks
(polarity sensitive connection). Connect the
two cables from CGL+ or Dali bus on the
'CGL+' or 'Dali' terminal blocks respectively
(polarity free connection).
Ensure the light fitting is securely earthed
Note: Make sure that the terminals on the module
cannot be touched when changing the lamp or
starter by shrouding them with earthed metal or
thermoplastic insulation.

TESTING THE CONVERSION

Electrical Tests
Earth Continuity: Earth resistance between earth
terminal and all metal parts must be less than 0,5
ohms at 10 Amps.
Electrical Strength: Ensure that there is no
breakdown when use 1500V ac (50/60Hz) test
voltage between the Neutral and Live bonded
together and the Earth terminal.
Testing an Installed Fitting:
Connect mains voltage to the unswitched
live supply and ensure that the LED is lit.
Connect mains voltage to the switched and
unswitched live supplies and check that the
lamp lights correctly.
Apply mains supply to the unswitched live
for a minimum of 10 min. Disconnect the
supply and check that the emergency lamp
lights.
It is recommended that a full duration test is
carried out by applying the mains supply for
8
Conversion kit LED

Publicidad

Tabla de contenido
loading

Tabla de contenido