DCF
INSTALLATION
Make the connections as shown in Fig. 1 (RX) and Fig. 2 (TX). Secure and power the photocell
(12 - 24 V DC/AC. Cover the photocell with the front panel and secure it with the screws provided. Interrupt
the photocell beam several times to check proper relay response.
JUMPER FUNCTIONS:
J1 and J2 = The photocell is set up to operate in synchronised mode. In this mode, the photocells
will only work if powered with alternating current and with the jumpers J1 (TX) and J2 (RX)
closed.When making the connections, pay attention to the exact position of the cables A and B
(Fig. 3).
If the device is powered with direct current, the jumpers J1 and J2 must be open.
J3 (RX)
CLOSED = Standard operation
OPEN = Delayed operation, to be used in particular weather conditions (snow).
N.B.: Delayed operation must not be set with the synchronism.
J4 = A B: N.C. output contact
J4 = B C: N.O. output contact
CE Declaration of conformity
The manufacturer:
Declares that the products: DCF180
Are in conformity with the following CEE Directives:
• EMC Directive 2004/108/CE and subsequent amendments
and that the following standards have been applied:
• EN61000-6-2, EN61000-6-3, EN60335-1
Date 10/01/08
GI.BI.DI. S.r.l.
Via Abetone Brennero, 177/B,
46025 Poggio Rusco (MN) ITALY
Managing Director
Oliviero Arosio
5
UK