Installation
Step 1
Have one or more standard 30cy roll-off
box delivered to the site.
front end of the box should be elevated
slightly to ensure the effluent flows out
the end of the box.
Step 3
Unfold the Geotube
®
GP-4 filling port in the middle of the roll-off
box.
Step 5
Screw in a threaded adaptor with elbow
and quick connect (not included). Refer to
GP-4 Port Connection Detail manual for
additional information.
4 I
NOTE:
The
MDS centering the
Step 2
Remove the Geotube
aging and place in the end of the roll-off
box. Unroll toward the front end of the
box.
Step 4
Remove the PVC fitting from the GP-4
and after applying glue, secure it in the
GP-4 filling port. (Glue not included.)
Step 6
Attach a flexible hose with quick
connect or hose clamps to fitting.
®
MDS from pack-