Installation
WELL POINT PUMP INSTALLATION
Materials needed in addition to Shallow Well General
Materials, for Well Points only
• Enough galvanized 1-1/4" pipe and drive couplings to reach
from operating depth to one foot above ground level
• One 1-1/4" galvanized elbow
• One 1-1/4" galvanized nipple
• One 1-1/4" check valve
• One 1-1/4" male PVC adapter
• One drive cap
STEP 1: Drive the well point into the ground according to
the instructions included with your well point. Use as much
galvanized pipe and as many drive couplings as it takes to
both drive the point 5-10 feet below the water table and leave
approximately one foot of pipe protruding from the ground.
STEP 2: Thread 1-1/4" galvanized elbow onto the pipe protruding
from the ground.
STEP 3: Thread 1-1/4" galvanized nipple into the 1-1/4" galvanized
elbow.
STEP 4: Thread 1-1/4" check valve onto the 1-1/4"
galvanized nipple.
STEP 5: Thread 1-1/4" male PVC adapter into the 1-1/4"
check valve.
STEP 6: FOLLOW STEPS 6–16 IN SHALLOW WELL
INSTRUCTIONS. Total installation should look like the drawing
below.
7145 1216
6
6117 1109