4
CAB FITTING INSTRUCTIONS
13.
Prior to fitting bolts I (fig 1.8) insert the
black metal packers provided into the
spaces J to ensure the cab cannot
move sideways. Once spacers are in
place tighten all mounting bolts.
14.
Loosen locknut M (fig 1.9)and turn nut
on underside of operators platform
clockwise in order to raise switch up.
On the Highway 2130 it will be
neccesary to do the same for the diff
lock engage foot switch.
15.
Stick self adhesive floor panels in
position, and lay flooring in place. On
the Highway it will be neccesary to
make a cut-out in the flooring for the
diff lock engage foot switch.
16.
Remove steering tower cover and
thread wiring harness under operators
platform, and up into steering tower.
Fit connector on end of harness to
connector N (fig 2.0) Wire colours
White/purple & Black. Ensuring there
is a 20 Amp fuse fitted at position O.
Cut grommet supplied and fit into cab
at point P (fig 2.1 Over-leaf)
PARTS AND FITTING INSTRUCTIONS FOR DIETEG
CAB TO HIGHWAY 2130 AND PARKWAY 2250 PLUS
Fig 1.8
Fig 1.9
Fig 2.0
GB-9