Assembly Of Components And Parts List - S19-120A - Bradley S19-120 Instalación

Ocultar thumbs Ver también para S19-120:
Tabla de contenido

Publicidad

Installation

Assembly of Components and Parts List - S19-120A

5
6.1
6
6.2
Item
Part No.
Qty.
1
S30-059
1
1.1
S27-278
1
1.11
110-214
1
1.2
153-489
1
1.3
124-048
1
1.4
128-201
1
2
128-156A
1
3
151-001
2
4
113-006LK
1
5
169-847
1
Bradley • 215-148 Rev. Z; ECN 17-05-039
1
Supply Inlet
1.1
4
3
6.12
6.11
NOTE: Use
teflon tape only.
Description
Stay-Open Ball Valve Assembly
Ball Valve with Jam Nut
Jam Nut (only)
Adapter
Washer
Handle
Pull Rod - 25½" Long
Curtain Hook
Pipe 1" NPT x 12" Long
90° Elbow 1" NPT
1" NPT
1.2
1.3
1.4
1.11
2
NOTE: Items 1.1–1.5 come preassembled as Item 1.
Items 6.1–6.2 come preassembled as Item 6.
Item
Part No.
6
S24-189
6.1
S24-193
6.11
187-053
6.12
154-147
6.2
S24-188
7
204-421
8
114-050
9
269-915
7/18/2017
S19-120, S19-120A
8
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-050
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
7
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
Date
Signed
Date
Signed
Datum
Unterschrift
Date
Signed
Date
Signe
Date
Signed
Qty.
Description
1
Stainless Steel Showerhead
Assy.
1
Stainless Steel Shroud Kit
1
Showerhead Shell
1
Ring
1
Plastic Showerhead Assembly
1
Emergency Tag
1
Safety Sign
1
Grip Pad
R
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

S19-120a

Tabla de contenido