TM
This faucet complies with NSF61/9, ASME/ANSI A112.18.1
and CSA B 125 Standards.
Este grifo se encuentra conforme con losestandares de NSF61/9,
de ASME/ANSI A112.18.1 y de CSA B 125.
SPOUT INSTALLATION
Insert spout base (7) and center over side hole of mounting surface. Insert spout shank through the
central hole in the deck.
Position spout (8) onto spout base (7). Place rubber washer (6), metal washer (5) and mounting
nut (4) over the shank and tighten the underside of the deck.
Insert nozzle (2) and seal o-ring (3) into T-connection (1).
Screw on the T-connection (1) onto spout shank as shown in fig. 4 firmly but do not overtighten.
Inserte la base del grifo (7) y centre con el agujero de la superficie de montaje. Inserte el tubo de
conección a través del agujero central en la cubierta.
Coloque la varilla elevadora (8) sobre la base del grifo (7). Coloque la arandela de goma (6), la
arandela del metal (5) y la tuerca de montaje (4) y apriete contra la superficie inferior.
Inserte el inyector (2) y la empaquetadura de anillo (3) en la conección „T" (1).
Ajuste la conección „T" (1) sobre el tubo de conección según lo demostrado en la fig. 4 firmemente
pero no apriete demasiado.
DRAIN ASSEMBLY INSTALLATION
1
2
3
4
5
6
7
8
9
11
12
10
ENGLISH
1
PROTECTIVE CAP
TAPA PROTECTORA
2
DRAIN PLUG
TAPÓN DE DRENAJE
3
DRAIN COLLAR
COLLAR DE DRENAJE
4
COLLAR GASKET
EMPAQUETADURA SUPERIOR
5
UNDER-BOWL GASKET
EMPAQUETADURA INFERIOR
6
WASHER
ARANDELA DE MONTAJE
7
FLANGED NUT
TUERCA DE MONTAJE
8
WASHER
ARANDELA DE TUBO
9
DRAIN BODY
CUERPO DE DRENAJE
10
DISCHARGE PIPE
PIPA DE DESCARGA
11
SEALING WASHER
ARANDELA SELLADORA
12
BALL ROD
VARILLA DE BOLA
13
BALL ROD NUT
TUERCA DEL PIVOTE
14
ADJUSTMENT PLATE
PLATO DE AJUSTAMIENTO
15
CLIP
BROCHE
16
SCREW
TORNILLO
IOG 2009.20
TWO HANDLE WIDESPREAD LAVATORY FAUCET
GRIFO DE DOS MANILLAS DE EXTENSION
INSTALACIÓN DEL GRIFO
INSTALACIÓN DEL DRENAJE
LIFT ROD
(fig.1, item 3 )
Varilla elevadora
(3 fig. 1)
16
14
15
13
FIG. 5
~
ESPANOL
Installation Instructions
ENGLISH
~
ESPANOL
Dismantle the drain assembly to the parts shown on fig. 5.
Insert collar gasket (4) and drain collar (3) into drain hole of a lavatory. From
underneath the lavatory slip under-bowl gasket (5) into drain collar (3), washer (6) and
flanged nut (7).
Position under-bowl gasket (5) correctly under the lavatory and screw flanged nut (7)
firmly but do not overtighten.
Make sure washer (8) is inside drain body (9) and screw drain body (9) onto drain
collar (3) hand tighten only.
Pay attention to align the drain body (9) so that the horizontal hole of drain body will be
in the same plane as a lift rod (3 fig.1). Tighten drain body (9) onto drain collar (3) and
tighten the flanged nut (7).
Insert drain plug (2) into drain collar (3).
Remove clip (15) from ball rod (12); undo a ball rod nut (13) from body, take out
sealing washer (11) from a nut and push the nut forward over ball rod (12) from the longer
end with the thread facing a ball.
Insert the sealing washer (11) and the ball rod (12) into a side hole of drain body (9).
Make sure that the rod ending goes under the plug screw head.
Tighten ball rod nut (13) making sure that the ball rod seat (11) and ball rod (12) are
properly installed.
Add Teflon tape to tail tube (10), and mount tail tube to drain body (9).
Lift the drain plug (2) to an open position, by lowering the horizontal ball rod (12) down.
Insert lift rod (3 fig.1) down through spout (1 fig.1) and top of lift rod strap (14).
Adjust to proper height and tighten screw (16).
Choose the position of horizontal ball rod (12) in one of the holes in lift rod strap (14).
Insert horizontal ball rod (12) through one arm of spring clip (15) and lift rod strap (14) and
then second arm of spring clip (15).
Try if a drain plug (2) closes the drain by pulling the lift rod. If not, make corrections of
position of lift rod strap (14) and horizontal ball rod (12).
Desmontar las piezas del drenaje según lo demostrado en la fig. 5.
Inserte la empaquetadura superior (4) y el tapon del drenaje (3) en el agujero del
drenaje de un servicio. Colaque por debajo del lavatorio la empaquetadura inferior (5) en el
collar del drenaje (3), la arandela (6) y tuerca de montaje (7)
Coloque la empaquetadura inferior (5) correctamente debajo del servicio y entornille
a tuerca de montaje (7) firmemente pero no apriete demasiado.
Cerciorese de que la arandela de tubo (8) este en el cuerpo del drenaje (9) y entornille
el cuerpo del drenaje (9) en el collar del drenaje (3) apriete solamente con la mano
Preste atención en alinear el cuerpo del drenaje (9) de modo que el agujero horizontal
del cuerpo del drenaje esté en el mismo plano que la varilla elevadora (fig.1, elem. 3). Apriete
el cuerpo del drenaje (9) sobre el collar del drenaje (3) y apriete la tuerca de montaje (7).
Inserte el tapón de drenaje (2) en el collar del drenaje (3).
Quite el clip de la abrazadera de muelle (15) del varilla de bola (12); retire la tuerca
del pivote (13) del cuerpo, tome hacia fuera el arandela selladora (11) a lo largo del
bola
(12) del extremo más.
Inserte el arandela selladora (11) y el
cuerpo del drenaje (9). Asegúrese de que el extremo de la barra va debajo de la cabeza del tornillo
del tapón.
Ajuste la tuerca del pivote (13) serciorandose de que el arandela selladora de la barra (11)
y el
varilla de bola
(12) este instalado correctamente.
Enrrollar la cinta de teflon para asegurar el pipa de descarga (10), monte colillo al
cuerpo del drenaje (9).
Levante el tapón de renaje (2) a la posición de abierto, moviendo el
d
hacia abajo.
Inserte la varilla elevadora (fig.1, elem. 3) por el agujero en el grifo (fig. 1, elem.1)
y inserte el plato de ajustamiento (14). Ajuste a la altura apropiada y apriete el tornillo (16).
Elija la posición del
varilla de bola
(12) en uno de los agujeros del plato de ajustamiento (14).
El
varilla de bola
(12) a través de la broche (15) y levante el plato de ajustamiento (14) y despues el
segundo brazo de la broche (15).
Intente cerrar con el tapón de drenaje (2) tirando de la varilla de elevación. Si no es
posible, haga las correcciones de la posición del plato de ajustamiento (14) y de la barra
horizontal del el
varilla de bola
(12).
4
Instrucciones de instalación
9
8
7
Lavatory
LAVATORIO
6
5
4
3
1
2
FIG. 4
ENGLISH
ESPANOL
varilla de bola
(12) en un agujero lateral del
varilla de bola
Rev. 3 February 2005
4
5
~
varilla de
(12)