Maintenance; Period Maintenance Schedule - DeWalt DXGN Serie Manual Do Operador

Ocultar thumbs Ver también para DXGN Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 49

8 Maintenance

8.
Maintenance
8.1

Period maintenance schedule

The following table contains the basic maintenance jobs for the machine. Jobs
selected with a check mark can be performed by the operator. The jobs marked
with a small box require special training and special equipment.
Check the fuel level.
Check the engine oil level.
Check the air cleaner.
Check external fastening parts.
Clean air cleaner elements.*
Check shockmount for damage.
Change the engine oil.*
Check and clean spark plug.
Replace the spark plug.
Clean the sediment cup.
Clean spark arrester.
Check and adjust valve clearance.
Clean fuel tank and filter.*
Check the fuel line. Replace when
necessary.
* Clean more often in dusty areas.
 
Daily
After the
before
first
Opera-
month or
tion
20 hours
28 
Every 3
Every 6
months
months
or 50
or 100
hours
hours
 
Every
year or
300 hours

Publicidad

Tabla de contenido
loading

Tabla de contenido