Section 6 - Operation; Using The Neck Checking Fixture - Tregaskiss TOUGH GUN Manual Del Propietário

Ocultar thumbs Ver también para TOUGH GUN:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6-1 Using the Neck Checking Fixture

Instructions for G-405CA (other fixtures similar)
 1.  Remove front-end consumables (nozzle, retaining head, and neck 
insulator), with the exception of TOUGH GUN I.C.E. Components.
 2.  Install the gauge point into the neck.
 3.  Slide neck completely into the datum block, aligning keys on neck to 
keyway in datum block.
 4.  Turn the neck completely clockwise against shoulder.
 5.  To secure the neck, use a 5/16" Allen key to tighten the socket head 
cap screw (SHCS) on the front of the datum block.
 6.  Push check pin towards gauge point.
 7.  Check pin should insert into the mating hole on gauge point.
 8.  Slip bending handle onto gauge point and bend until aligned with 
check pin.
 9.  Remove neck from datum block and gauge point from neck.
 10.  Reinstall front-end consumables.
IMPORTANT NOTE:
There should always be a 0.016" gap between the neck body and the 
datum block (see Figure 6-D) when the neck is properly installed. 
If the rear stop was removed to close this gap, it must be reinstalled! 
The rear stop should only be removed to clean debris from inside the 
block and then immediately reinstalled. 
Never operate the fixture without the rear stop installed.
 
13
OM-NCF-1.6
SECTION 6 — OPERATION
Figure 6-A 
Figure 6-B 
Figure 6-C 
Figure 6-D

Publicidad

Tabla de contenido
loading

Productos relacionados para Tregaskiss TOUGH GUN

Este manual también es adecuado para:

Tough gun neckTough gun om-ncf-1.6

Tabla de contenido