instruction manual
for use and maintenance of BLW series
During testing and break-in operations it
is advisable to use the personal protection
equipment listed to the side.
4.1 - TESTING
All Battioni Pagani
vacuum/pressure blowers pumps are tested before delivery at our factory.
®
4.2 - RUNNING IN
The running in period foreseen for a vacuum/pressure blowers pump is 30 effective working hours. During that period the working
parameters must be reduced by 20%.
ATTENTION: do not operate the vacuum/pressure blowers pump in the opposite direction of rotation.
5.1 - START-UP
During start-up, operation and shutdown
manoeuvres it is advisable to use the
personal protection equipment listed to the
side.
The vacuum/pressure blowers pump does not have a start command. To start it simply transmit motion to the PTO in the manner
appropriate to the version being used. Make sure, before starting the motor, that the vacuum/pressure blowers pump is supplied with
oil for lubrication of the bearings and gears in the front and rear casing.
Before starting the vacuum/pressure blowers pump, ensure that the guards on all the moving parts are in
place and efficient. Any damaged or missing components must be replaced and installed correctly.
5.2 - DAILY CHECKS TO BE PERFORMED
CHECKS TO BE PER-
FORMED
During the first few hours of operation, check that there are no abnormal vibrations
or noises. In the event of anomalies, stop the vacuum/pressure pump immediately and
contact the Battioni Pagani
page 38
4.0 - TESTING AND RUNNING IN
5.0 - START-UP, OPERATION, SHUTDOWN
CHECK
Check Pressure
Check temperature
Check absorbed power
Check abnormal noises
Oil level (front and rear)
Service
®
FREQUENCY
DAILY