REGULATIONS
• The manufacture states that the product
referred to in this booklet was manufactured
in compliance with the Community
Directives as shown in the declaration of
conformity attached to this booklet.
NAMES OF PARTS (Fig. 1)
1. Machine body
2. Water tank
3. Tank lid
4. Capsule-holder compartment
5. L e v e r f o r o p e n i n g c a p s u l e - h o l d e r
compartment
6. Drip basin and capsule drawer
7. Removable cup-grid
8. Power plug
MACHINE CONTROLS (Fig. 1)
9. Coffee dispensing switch
10. Water heating light
11. Line light
12. ON/OFF switch
PREPARING THE MACHINE
Water filling
• Open the tank lid (3 Fig. 2) and pour cold water
into the tank (2 Fig. 2) (maximum 1l), then put
back the lid (3 Fig. 2).
Electric connection
Before connecting the machine to the
electricity make sure that the switch (12
Fig. 1) is in the "OFF" position.
• Connect the machine to the electricity by
inserting the plug (8 Fig. 1) in the socket.
All manuals and user guides at all-guides.com
Staring up for the first time
The first time you use the machine, or if it has
not been used for a long time, the following must
be done:
• Remove the tank (2 Fig. 3) from the machine,
• Make sure the lever (5 Fig. 4) is down, and then
• Press the switch (12 Fig. 1) and bring it to "ON";
• Press the switch (9 Fig. 1) and wait until water
Starting up the machine
• Make sure there is enough water in the tank (2
• Press the switch (12 Fig. 1) to "ON"; light 11
• Heating of the water in the tank starts
• Wait the reaching of water temperature
wash it well with water and put it back in the
machine making sure it is fitted in properly.
place a cup on the grid (7 Fig. 4).
the light (11 Fig. 1) goes on.
starts coming out of the dispensing wand, then
press the switch again (9 Fig. 1) again.
This operation is necessary to make
sure the tank is filled.
Fig. 1); if not, fill in water as explained in section
"Water filling".
comes on to indicate line switched on.
automatically
signalled by the switching-on of warning light
(10 Fig.1).
English
17