Installation - Agio 2127009 Manual Del Usuario

5 piezas juego de sala tejida con chimenea
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

W
X
Y
1. Carefully unpack all items from the box. Place the base in the final position. There must
be a minimum of 60.96 cm / 24 inches of clearance from the side of the table top to any
combustible walls.
2. Place the firepit tabletop onto the firepit base. Secure the tabletop to the firepit base by
using the 1/4 x 20 mm screws and washers that are provided. See Figure 3.
3. Place the burner pan protective ring into the firepan/burner assembly as shown in Figure 4.
Align the holes in the burner pan protective ring with the pre-drilled holes on the firepan/burner
assembly. Secure the burner pan protective ring to the firepan/burner assembly by using the
two M4 screws as shown in Figure 4.
FIREPIT BASE
BURNER COVER
ORIFICE HOLDER

INSTALLATION

6
FP3558
1
FP3559
1
FP3573
1
Figure 3
Figure 4

Publicidad

Tabla de contenido
loading

Tabla de contenido