Notes, Guidelines And Tips; Boiler Decommissioning; Quick Reference Guide - Fire And Safety; End Notes For Installers - Kostrzewa Twin Bio Luxury Compact NE 8 Manual De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 257
10. Important notes | 11. Decommissioning | 12. Quick reference... | 13. Final ...
102

10. Notes, guidelines and tips

Before burner start-up check water level in the heating
system. Fuel storage hopper must be filled with fuel to
the required level to ensure reliable boiler operation.
CAUTION!
USING FUEL WITH DIFFERENT SPECIFICATIONS MAY AFFECT DEVICE
OPERATION AND CAUSE DAMAGE. FUEL WITH SOLIDS, INCLUDING
STONES ETC. IS TREATED AS INCOMPATIBLE. THE MANUFACTURER
IS NOT LIABLE FOR ANY DAMAGE DUE TO THE USE OF INCOMPATIBLE
FUEL. USE SAFETY GLOVES AS A PROTECTION AGAINST BURNS AND
FOLLOW SAFE OPERATION GUIDELINES TO ENSURE SAFE MAINTENANCE.
Heat exchanging surfaces are contaminated during operation resulting in an
increase in temperature at the flue gas outlet and reduced efficiency.
CAUTION!
THE DEVICE HAS TO BE INSTALLED AND COMMISSIONED BY
A COMPANY AUTHORIZED BY THE MANUFACTURER, OTHERWISE IT
MAY INVALIDATE THE WARRANTY. DO NOT OPEN THE DOORS
AND COVERS WHILE BOILER IS IN OPERATION (BURN HAZARD).
DO NOT OPEN DOORS DURING FUEL IGNITION (EXPLOSION HAZARD).
DO NOT USE STARTERS AND FLAMMABLE MATERIALS TO LIGHT
A FIRE. DO NOT STORE FLAMMABLE MATERIALS NEAR
THE BOILER OR THE BURNER.
Keep the minimum return temperature (45°C) to ensure correct boiler operation -
risk of flue gas water condensation. Some condensate may occur during start-up
(heating). After the heating season, thoroughly clean the boiler and the flue
ducts. Keep the boiler room clean and dry.
Leader in pellet boilers

11.Boiler decommissioning

Most of the boiler components are made of steel and can be disposed of by
returning to an authorised scrap yard. Other components must be disposed of in
compliance with applicable regulations.

12. Quick reference guide - Fire and safety

1.
Before you start your boiler, please read the manual.
2.
Do not use solvents, petrol etc. to light a fire.
3.
Do not open live devices. Risk of electric shock.
4.
Fire fighting equipment should be installed in the fuel storage and boiler
room.
5.
Prevent unauthorized access.
6.
The heating system equipment may be operated by authorized and trained
personnel only.
7.
Check the wiring system and the flue system periodically.
8.
Do not obstruct air flow to the air grilles.
9.
Check the burner operation and the flue gas quality, adjust the burner or
analyse flue gas as required.
10. Disconnect power supply (main switch) before maintenance.
11. Keep the work area clean and tidy.
12. All repairs must be carried out by authorized and trained personnel or
authorized service personnel only.
13. Use carbon-dioxide or dry-powder extinguishers only.

13. End notes for installers

Connect the boiler to the hydraulic system by installing the mixing valve
with the boiler circulation pump which ensures the return water tempera-
ture of at least 45°C.
Before connecting the boiler to the flue system, contact the relevant
authorities for approval.
The compression tank must be connected with the boiler via a supply duct
without any cut-off devices.
Twin Bio Luxury Compact NE v01 User Manual – EN 01.19

Publicidad

Tabla de contenido
loading

Tabla de contenido