Tweco FUSION 250 Manual De Instrucciones página 19

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7. Thread the pressure nut onto the
replacement front connector until it
bottoms out and then slide the sleeve
over the connector.
Note: Make sure the bevel is facing the
right direction.
8. Insert the replacement connector nipple
into the inner core tube of the Cablehoz.
It is recommended to use a small amount
of non-petroleum based lubricant* to help
the connector to slide into the tube. The
core tube should bottom out against the
shoulder, approximately 15/16" (23,8
mm) onto the connector.
*A small amount of white glue works well.
9. Push the copper strands underneath the
sleeve. It is recommended that a 1/8"
glass filament tape be wrapped around
the exposed copper to keep the copper
strands together when tightening the
pressure nut.
10. Begin to turn the pressure nut counter-
clockwise which will force the copper
strands & sleeve against and then under
the machined taper on the connector.
Use Torque Wrench and wrench to
perform this task.
11. Torque the pressure nut to 250 inch
pounds, +/-50 inch pounds, (28,2 newton
meters, +/- 5,6 newton meters).
12. Apply clamp over outside cable and
tighten. Trim excess clamp.
13. Connect lead wires accordingly.
14. Re-assemble the front end.
89200015
SAFETY AND OPERATING INSTRUCTIONS
All manuals and user guides at all-guides.com
17
Bevel
Approx.
2" (5mm)

Publicidad

Tabla de contenido
loading

Productos relacionados para Tweco FUSION 250

Tabla de contenido