Locking The Reserve Parachute Handle - SUPAIR ALTIRANDO LITE Manual De Instrucciones

Ocultar thumbs Ver también para ALTIRANDO LITE:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Harness User's manual | ALTIRANDO LITE
- Secure the installation by pushing the right side of the yellow cable
through the loop cord «1» then, the sleeve.
- Secure the installation by pushing the left side of the yellow cable
through the loop cord «5» then, the sleeve.
- Carefully remove the line.
- Insert the
and
ends of the handle in their respective housing,
C
D
then push the magnet flap
E
E
C
D
A
B

Locking the reserve parachute handle.

3
A
B
in place to secure the handle.
INSTALLING THE RESERVE PARACHUTE
Mandatory extraction test procedure
Have the installation checked by a professional outfit.
Conduct an extraction test every six ( 6 ) months to assure proper
system functionality.
Note  : conducting and extraction test does not imply deploying the
reserve parachute which will stay inside its POD.
Check the completed
installation during a
hang-test.
ALTIRANDO LITE | page 18

Publicidad

Tabla de contenido
loading

Tabla de contenido