Electrical Connection; Terminal Diagram; Commissioning; Requirements For Initial Commissioning - Reflex Fillcontrol Plus Compact Manual De Instrucciones Original

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 28
6.5

Electrical connection

DANGER
Risk of serious injury or death due to electric shock.
If live parts are touched, there is risk of life-threatening injuries.
Ensure that the system is voltage-free before installing the device.
Ensure that the system is secured and cannot be reactivated by other
persons.
Ensure that installation work for the electric connection of the device is
carried out by an electrician, and in compliance with electrical
engineering regulations.
DANGER
Risk of serious injury or death due to electric shock
Some parts of the device's circuit board may still carry 230 V voltage even
with the device physically isolated from the power supply.
Before you remove the covers, completely isolate the device controller
from the power supply.
Verify that the main circuit board is voltage-free.
The power supply of the device is prepared by the factory:
Power unit for wall socket.
Plug for jack socket.
The electric wiring must be carried out by an electrician in accordance with all
applicable national and local regulations.
A socket with a power supply of 230 volts for the connection must be provided
by the customer.
6.5.1

Terminal diagram

No.
Designation
1
Potential-free alarm
signalling contact for
forwarding of alarms to a
building control system /
Terminal 3-pole
2
Pressure sensor - PH
connector 3 pole
3
Motor,
Micro switch,
Battery - PH connector 6-
pole
4
Signal transmitter
5
Pressure sensor - PH
connector 3 pole
Assignment (from left to right)
Connecting bridge (in normal
operation, bridge between 1+2,
in fault between 2+3)
Root
Changeover switch to reverse the
function of the switches 1+2
Pressure sensor supply
Pressure sensor earth
Pressure sensor signal
Battery + pole
Battery earth
Motor earth
Motor supply
Micro switch
Micro switch
Pressure sensor supply
Pressure sensor earth
Pressure sensor signal
Fillcontrol Plus Compact — 03.05.2022 - Rev. D
No.
Designation
6
Plug terminal of the
integrated motorised ball
valve
7

Commissioning

Note!
Confirm that installation and start-up have been carried out correctly
using the installation and commissioning certificate. This action is a
prerequisite for the making of warranty claims.
Have the Reflex Customer Service carry out commissioning and
the annual maintenance.
7.1

Requirements for initial commissioning

The device is installed.
The connections to the system circuit and the mains water system are
made
All shut-off devices to the system circuit and the mains water system are
provided.
The electrical connection has been created according to applicable
national and local regulations.
The pipelines to the device are purged and free of dirt and welding residue.
The connection of the drain funnel to the waste water system is made
according to the applicable DIN EN 12056 standard.
The provided pressure gauge is installed at the pressure reducer.
7.2
Determining the P
minimum operating pressure for the
0
controller
The "P
" minimum working pressure for the device is used in system circuits with
0
a diaphragm expansion vessel.
Calculate the "P
" minimum working pressure for the device:
0
The device is installed at the same level (h
expansion vessel:
P
= p0
0
The device is installed at a lower level than the diaphragm expansion
vessel:
P
= p0 + h
/ 10
0
st
The device is installed at a higher level than the diaphragm expansion
vessel:
P
= p0 - h
/ 10
0
st
P
Minimum working pressure in bar
0
p0
Initial pressure, diaphragm expansion vessel, in bar
h
Static elevation in m
st
Note!
Calculate the filling pressure for the make-up with mains water into the
system circuit as follows:
Filling pressure ≥ P
+ 0.3 bar
0
Note!
During planning, take into account that the working range of the
device must be between the "PA" initial pressure and the "PE" final
pressure in the pressurisation working range.
Commissioning
Assignment (from left to right)
= 0) as the diaphragm
st
English — 15

Publicidad

Tabla de contenido
loading

Tabla de contenido