6. The Communication Port con't.
11. Start Time of Pressurization: 3:21(start of 'C' phase)
12. Start Time of Sterilization: 4:12 (start of 'D' phase)
13. Temp. / Press. & Time at start of sterilization ('D' phase)
14. Min. Temp. / Press during the sterilization phase (lower limits of 'D' phase)
15. 135.1˚C 308 kPa
16. Max. Temp. / Press during the sterilization phase (upper limits of 'D' phase)
17. 136.7˚C 323 kPa
18. Temp. / Press. & Time of end of sterilization phase (end of 'D' phase)
19. Time Venting started: 7:43 (start of 'E' phase)
20. Sterilization was successfully completed
21. Time Air Drying started: 8:07 (start of 'F' phase)
22. Cycle was stopped by user
23. Drying cycle aborted prior to completion, load may not be dry
34