Installing Outdoor Unit - ZKTeco ZL700 Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installing Outdoor Unit

5
1)
Connect 6 PIN end of Transfer Cable with Mortise cable.
2)
Insert a Spindle A into the clutch toward Outdoor Unit.
3)
Attach the Outdoor Unit to the door by connecting 8 PIN end of Transfer Cable with
mainboard on the drilled holes.
5

Publicidad

Tabla de contenido
loading

Tabla de contenido