Installation and Connections / Instalaci
1.
Install valve body and plumbing, figure 1. Note:
Face of plasterguard (1) should be flush
with finish wall line.
Instale el cuerpo de la
válvula y el fontanería, figura 1. Nota: Manguito protectorial (1)
debe estar al ras con la pared.
保护套 (1) 应与墙面平齐.
按照图1安装阀体和管道。注意:
및배관.
주의:
보호 슬리브
1A.
1B.
1
1 5/8"
(42 mm)
1"
(25 mm)
4 1/8"
(105 mm)
4 1/8"
(105 mm)
Hole Size
Tamaño de Agujero
钻孔尺寸
홀사이즈
2E.
2D.
G 1/2 -
ISO228/1
3 15/16"~4 1/8"
(101mm~105mm)
G 1/2 -
ISO228/1
87336
Rev. C
ón y conesiones /
安装和连接 /설치 및 연결을
Install trim figure 2.
2.
Instale la guarnici
按照图2安装明处部分。
(1)
커버 벽면과 일치할것.
2A.
2B.
2C.
Check for correct operation, figure 3.
3.
Pruebe si funciona correctamente, figura 3.
按照图3检查龙头工作是否正常。
3A.
3B.
3D.
3C.
3E.
2
Maintenance / Mantenimiento / 维护 / 유지
4.
Replace the ceramic cartridge, figure 4.
ón, figura 2.
按照图4更换阀门系统。
4.
Parts / Piezas / 零件图 / 부품
ISH11006
4
4
RP76838
RP60674
RP40709
RP76211
RP196
RP46866
RP76210
RP81809
ITS61339
3
RP46868
RP36445
RP81823
RP72944
87336
Rev. C