Midwest Feline Nuvo Tower Manual De Instrucciones página 3

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5.
Place the Middle Platform (J) over the Dual-Threaded
screws as illustrated. The middle and bottom platforms
should be aligned.
Screw the two Sisal Wrapped Tubes (L and N) onto the
6.
Dual Threaded screws. You may need to loosen the
screws so they catch the threading inside the Tubes.
Turn the Tubes clockwise until they fully tighten.
7.
Insert the thread of the Dual Threaded Screw with Even
Threads (Q) into the Sisal-Wrapped Tube on the right, as
illustrated, until the lower threads disappear. Do NOT
tighten.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Feline nuvo 138t-bkFeline nuvo 138t-mrd

Tabla de contenido