Thomasville SPLS-BRBK-TV Instrucciones De Montaje página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Please read completely through the instructions and verify that all listed parts and hardware are present
before beginning assembly.
A- Top Panel (Qty. 1)
D- Left Side Frame (Qty. 1)
G- Top Stretcher (Qty. 2)
(1) 1/4" x 15mm Bolt
(Qty. 22+1 extra)
(4) Shelf Pin
(Qty. 8)
Tools required (not included): Phillips screwdriver, stud finder, pencil, tape measure, power drill and 1/8 in drill bit.
Parts and Hardware List
B- Shelf (Qty. 2)
E- Right Side Frame (Qty. 1)
H- Middle Back Stretcher(Qty. 1)
(2) 1/4" x 55mm Bolt
(Qty. 4+1 extra)
Hex Wrench
(Qty. 1)
4
C- Bottom Panel (Qty. 1)
F- Bottom Frame (Qty. 1)
I- Metal bar (Qty. 4)
(3) M4 x 32mm Screw
Tipping Restraint Hardware Kit (Qty. 2)
(Included in plastic bag)
(Qty. 6+1 extra)

Publicidad

Tabla de contenido
loading

Tabla de contenido