Samsung DVEG50R5400 Serie Manual Del Usuario página 22

Ocultar thumbs Ver también para DVEG50R5400 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
STEP 3 Connect the electrical wiring (for electric models)
Before connecting the electrical wiring, make sure you have read the "Electrical requirements" section on
page 17.
3-wire system
A
B
C
L2
A. External ground connector
B. Neutral grounding wire (white)
C. Center silver-colored terminal block
screw
D. Neutral wire (white or center wire)
E. 3/4" (1.9 cm) UL-listed strain relief
22
English
Untitled-14 22
1. Loosen or remove the screws from the center
terminal block.
2. Connect the neutral wire (white or center wire) of the
power cable to the center, silver-colored terminal
screw of the terminal block. Tighten the screws.
3. Connect the other wires to outer terminal block
screws. Tighten the screws.
4. Tighten the strain relief screws.
D
5. Insert the terminal block cover into the rear panel of
the dryer. Then, secure the cover with a hold-down
screw.
L1
CAUTION
E
• To convert from the 4-wire system to 3-wire system,
connect the ground strap to the terminal block
support to ground the dryer frame to the neutral
conductor.
• Ring-type terminals are recommended. If using strap
terminals, make sure they are tightened.
• Connect the power cord and check L1/L2/N voltage.
If the voltage is low, it may not heat properly. Review
the "Electrical requirements" section on page 17 if
needed.
2021-08-23
6:30:54

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido