Furrion CHILL FACR13HESA Serie Manual Del Usuario página 8

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Mounting Hole
6. Pull to remove the film off the double sided sticky tape on
the inner side of the lower duct divider.
7.
Stick the upper duct divider into the assembled mounting
frame.
NOTE: Make sure the upper duct divider is pressing
against the ceiling before finally sticking it.
Upper Duct
Divider
8. Peel to remove the release paper from the PE foam,
overlap the sticky side over all gaps and compress to seal
and insulate the entire section.
PE Foam
CCD-0005773 Rev: 04-25-22
9. Remove the cable compartment cover using a Phillips
Film
10. Loosen the cable clip on top of the control box and let the
11. Tighten the cable clip until the cable is snapped tightly.
12. Fit all cables into the cable compartment and tuck any
- 7 -
screw driver.
DANGER
Electrical Shock Hazard
Disconnect power before servicing. Failure to obey this
warning could result in death or serious injury.
Provide grounding in compliance with all applicable
electrical codes. Failure to obey this warning could result
in death or serious injury.
115VAC power cord pass through the cable clip. Make the
115VAC power supply connection to the control box and
ensure they are properly insulated by using twist caps.
NOTE: Always follow the color code while connecting the
cables.
Black - Hot
White - Neutral
Green/yellow - Ground
NOTE: Do not over tighten.
excess wires up out of the way. Tighten the cover with
screw.

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido