Yealink MeetingBoard 65/86 Guia De Inicio Rapido página 8

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7
Mount the endpoint and lock the security screw on the back of
the endpoint
* We recommend 2 people working together to mount MeetingBoard Install 65, 4 people working together to mount MeetingBoard
86 ( MeetingBoard 86 can be carried by the handles on both sides).
If the power port and network port of the conference room are located on the back wall of the
endpoint to be installed, connect the cables first before installing the endpoint.
The wall-mounted bracket (b) on both sides need to be snapped into the slots at the same
time.
X 2
(M5*100mm)
6
3
1
2

Publicidad

Tabla de contenido
loading

Tabla de contenido