Yealink MeetingBoard 65/86 Guia De Inicio Rapido página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2
Endpoint Installation
If you are using a floor stand for installation, please refer to
(Floor-Mounted).
Take and place all components gently to avoid damage.
MeetingBoard 65
We recommend 2 people working together to mount MeetingBoard 65, 4 people working together to
mount MeetingBoard 86.
1
Determine wall-mounted bracket (a) installation position
1.
Please install on a vertical, load-bearing solid wall or concrete wall (use expansion
screw) or planks, other reinforced walls (use self-tapping screws) with more than
20 cm thickness.
2.
For other type of walls, please reinforce the wall and verify the feasibility before in-
stallation. Verification method: Install a screw to carry out a single screw load test
for 1 minute (MeetingBoard 65 load-bearing 35 kg, MeetingBoard 86 load-bearing
45 kg), and the installation can continue if the screw is not loose.
3.
The wall-mounted bracket for MeetingBoard 65 and MeetingBorad 86 are only dif-
ferent in size, and the installation method is the same.
4.
The installation height data is for reference only. You can choose a suitable posi-
2
tion as needed.
1490mm (65 inches)
1968mm (86 inches)
MeetingBoard 86 has handles on both sides, but MeetingBoard 65 does not.
MeetingBoard 86
Quick Start Guide
97mm
26mm

Publicidad

Tabla de contenido
loading

Tabla de contenido