Fig. 3
A
STEP 3:
Run power cable through the back opening of the solar panel housing,
see Fig. 3.
Connect power cable to cable found on the back of the Solar Panel (B), see
Fig. 4.
Insert back of Solar Panel (B) into the opening of the solar panel housing.
Turn Solar Panel (B) clockwise to secure it to the solar panel housing, see
Fig. 5. See Figure 6 for how it should look when assembly is complete.
10
Assembly Instructions
Fig. 4
Fig. 5
B
Solar Panel
Housing
Power
Cable
Fig. 6
*Place a counterweight such as an offset umbrella base (not
included) that can be filled with water or sand, or triangular
weight bases (not included) before proceeding further. An offset
umbrella base should be able to hold 150 lbs. of sand or water,
or 4 triangular weight bases, minimum 38 lbs. each. This is the
recommended amount of weight to maintain product stability,
especially while umbrella canopy is open.
Fig. 7
Prong
Band
STEP 4:
Place the pole of the Umbrella Frame (A) inside of the Bottom Pole (C)
so that the prongs fit within groves at the top of part C, see Fig. 7. Insert
Locking Knob (H) through band found at the top of part C, and into
the bolt-threading of this part, see Fig. 7. Insert second Locking Knob
(H) into bolt-threading underneath band. Tighten the Locking Knobs
(H) until pressed against the pole of the Umbrella Frame (A) enough to
hold it in place, see Fig. 7. Over tightening may dent or chip away at the
protective coating of the Umbrella Frame (A).
Assembly Instructions
H
11