PNI AP800C Manual De Usuario página 6

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 42
Important notes
Power the control unit to a separate 10A power supply.
»
The rack must be installed on a straight line, parallel to the gate.
»
Keep a distance between the rack and the gear of the engine so as not to
»
overload the engine.
Install the stop in the opening direction of the gate to prevent the engine
»
from running uncontrollably.
Engine installation
Choose your engine installation location carefully.
»
Temporarily place the engine mounting base at a distance of 35 mm from
»
the gate. (Diagram 1)
Put the engine on the stand.
»
Test with a piece of rack positioned on the gear wheel if the engine is at
»
the right height.
Make a drawing around the engine mounting bracket.
»
Lower the engine from the bracket.
»
Mark on the ground where you need to drill the 4 holes to fix the support.
»
(Diagram 2)
Make 4 holes in the marked places.
»
Secure the bracket and motor using screws and dowels.
»
Rack installation
With the key included in the package, open and pull the lever to manually
»
close the gate.
User manual
6

Publicidad

Tabla de contenido
loading

Tabla de contenido