Service & Maintenance - Altrad BELLE BULLDOG & HPP Manual Del Operador

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 38
GB
The following schedule details the attentions considered necessary to ensure satisfactory operation of the power unit.
NOTE:- The attentions and periods summarised in the schedule are the initial recommendations and should be revised to suit the
Item
Attention
Complete Unit.
Wheels and Feet.
Transmission
Hoses.
Engine.
Hydraulic Tank.
Oil Cooler.
DO NOT USE A WIRE BRUSH
Return Line Filter.
Hydraulic pipes /
connectors.
System Pressure and Flow Checks
relief valve setting is correct. The hydraulic oil will tend to get quite hot during this operation and therefore the checking should be
carried out as quickly as possible and the load valve opened before excessive temperatures are reached.
DO NOT EXCEED 3600 RPM (2900 RPM for Major 30-140)"on load" .
speed then the pump must be replaced
Service & Maintenance
22
First 50
10
100
Hours
Hours
Hours
300
Hours

Publicidad

Tabla de contenido
loading

Tabla de contenido