Installation Method Checklist
DO NOT DRILL ANY HOLES IN CHARGER UNTIL METHOD IS DETERMINED
Minimum 100 Amp Service Available for Standard 80 Amp Installation
1
If Customer does not have 100 Amp available, refer to Amp Setting Switch to adjust Charger
Amperage (Listed in Table of Contents)
2
Standard Mounting to Interior Stud Wall (Hardware Included)
Exterior Mounting to Non-Standard Wall (Concrete, Brick, Non-wood surfaces)
Non-Standard Mounting hardware not supplied – Alternate Hardware chosen must support
3
100 Lbs.
Mounting requiring watertight Glands (Conduit Mounting Hardware not supplied).
4
Rigid Conduit is preferred installation method.
AC Rear Inlet Wiring Method (Standard – Mounting Hole supplied in Charger)
5
NOTE: Remove Rear Plug prior to attaching Charger to Mounting Bracket if this method is
chosen
AC Left Inlet Wiring Method (Alternate – Requires Drilling for 1" Trade Size Conduit)
1" Meyers Hub (Type 4 or 4X) requires 1-3/8" Hole (Follow Hub manufacturer's instructions)
6
Conduit Mounting Hardware not supplied
AC Right Inlet Wiring Method (Alternate – Requires Drilling for 1" Trade Size Conduit)
1" Meyers Hub (Type 4 or 4X) requires 1-3/8" Hole (Follow Hub manufacturer's instructions)
7
Conduit Mounting Hardware not supplied
HVDC Inverter
(If customer has Inverter – Requires Drilling for ¾" Trade Size Conduit either Left or Right)
8
¾" Meyers Hub (Type 4 or 4X) requires 1-1/8" Hole (Follow Hub manufacturer's instructions)
Conduit Mounting Hardware not supplied
9
HVDC Inverter Inlet Left Wiring Method
10 HVDC Inverter Inlet Right Wiring Method
Installation Method Checklist
P a g e
| 5