•
Do not set waypoints that make a virtual boundary
go across itself in the same work area.
•
Save the work area to automatically connect the
first and last waypoint with a virtual boundary.
8
7
6
To make a stay-out zone
Minimum 3 waypoints are necessary to make a stay-out
zone.
•
Operate the product counterclockwise around the
boundary of the stay-out zone.
•
Add waypoints on the map. Add the waypoints
minimum 3 cm / 1 in. from obstacles.
•
Do not set waypoints that make a virtual boundary
go across itself in the same stay-out zone.
•
Save the stay-out zone to automatically connect
the first and last waypoint with a virtual boundary.
1944 - 001 - 13.01.2023
1
2
3
5
4
To make a transport path
•
Operate the product and add waypoints on the
map to install a transport path. Start in a work area
minimum 1 m / 3.3 ft. from the virtual boundary.
•
Do not install a transport path across a stay-out
zone.
•
Do not set waypoints that make the transport path
go across the same transport path.
•
Operate the product and add waypoints to connect
the transport path to the docking point.
•
Save the transport path to automatically connect
the last waypoint to the docking point.
•
Set the corridor width (A) for the transport path.
The corridor width can be set to 2-5 m / 6.6-16.4 ft.
A
To make a maintenance point
•
Operate the product and add waypoints on the
map. Start to add waypoints at the position
where you install the maintenance point. The first
waypoint specifies the maintenance point.
•
Operate the product and add waypoints to make a
path to the charging station.
•
Save the maintenance point to automatically
connect the last waypoint to the docking point.
•
Set the corridor width (A) for the maintenance
point. The corridor width can be set to 2-5 m /
6.6-16.4 ft.
Installation - 119