Descargar Imprimir esta página

STEINEL NightmatIQ Manual Del Usuario página 36

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 133
4. Electrical connection
Circuit diagram
4.1
I
O
The mains power supply lead is a 3-core cable:
=
Phase conductor (usually black, brown or grey)
L
N
=
Neutral conductor (usually blue)
PE
=
protective-earth conductor (green/yellow)
The floodlight can also be connected to the power supply
downstream of a mains switch if it is ensured that the
mains switch is left ON all the time.
The sealing plugs provided are intended for a mains supply
lead with an outer diameter of 5-10 mm.
N
N
L L
N
PE
L
– 9 –
L
N
Index

Publicidad

loading

Este manual también es adecuado para:

Nightmatiq plus40078410661474007841066130