Descargar Imprimir esta página

PNI GreenHouse SC1800C PRO Manual De Usuario página 16

Inversor solar

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 113
Instructions for use
Turn the inverter on/off
After the inverter has been installed correctly,
press the on/off button to start the inverter.
Mandatory inverter start-up procedure: 1. Connect the batteries to the
inverter (Use the installed isolation switch); 2. Turn on the inverter from
the ON/Off button; 3. Connect the photovoltaic panels (using the installed
isolation switch) 4. Connect the network (if available using the installed
automatic switch); 5. Connect the consumers in turn (if available using the
installed automatic switch).
Mandatory procedure when turning off the inverter/in case of maintenance
or breakdown: 5. Disconnect the consumers (using the installed automatic
switch); 2. Turn off the inverter from the ON/Off button; 4. Disconnect
the network (if available using the installed automatic circuit breaker); 3.
Disconnect the photovoltaic panels (using the installed isolation switch) 1.
Disconnect the batteries from the inverter (Use the installed isolation switch);
Control panel and screen
The control panel is located on the front panel of the inverter. Includes 3 LED
indicators, 4 touch keys and the screen to indicate the operating mode or
information about the inputs and outputs of the inverter.
User manual
1. LCD screen
1
2. LED indicators
3. Function keys
2
3
16

Publicidad

loading

Este manual también es adecuado para:

Pni-sc1800pro