Descargar Imprimir esta página

Cinderella TRAVEL Manual De Instalación página 6

Ocultar thumbs Ver también para TRAVEL:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 50
CONNECTING AND TEST OF TOILET
Testing procedure after installation and before adding panels
and closing hatches
• Open main gas supply valve from gas container
• Check for gas leakages on supply line
• Turn on main switch located inside toilet,
see illustration 5.
• Open and close toilet lid
• Start incineration on control panel
• Wait 2-3 minutes for continuous incineration
• Stop incineration by pressing incineration button
until a long beep is heard (approx. 8 sec)
• Close main gas supply valve from gas container
If you do not have the control panel in place yet, you can still
test the toilet by connecting the control panel to the signal
cable.
FINAL INSTALLATION
Adjust docking frame for equal clearance around outer shell. Some modification might be necessary
for perfect fit. Please note: the docking frame is made for mounting behind the steel plate on the toilet.
This will give better clearance between outer shell and docking frame when operating the shell
elevator. Operate the shell elevator to ensure that there is no contact during operation. When the toilet
is tested, mount panels and close covers. Mount control panel if not mounted earlier.
DIMENSIONS
CUTOUT DIMENSION IN REAR WALL
The following dimensions act as a guideline for cut out in the interior wall of the room, behind where
the Cinderella Travel will be positioned.
6
15
750
745
(Min. 281,4)
515,4
509,2
500
405,6
306
91
80
0
Illustration 5
Illustration 6

Publicidad

loading