Descargar Imprimir esta página

HomeMatic IP HmIP-RGBW Manual De Instalacion Y Uso página 29

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 51
Please observe the hazard information in section "2 Hazard informa-
tion" auf Seite 26 during installation.
Please note the insulation stripping length of the conductor to be
connected, indicated on the device.
Permitted cable cross-sections for connection to a supply voltage of
12–24 V
are:
DC
Rigid cable [mm
0.5–2.5
Permitted cable cross sections for connecting to the LED strips are:
Rigid cable [mm
0.2–1.5
5.2
Mounting and installation
Please read this entire section before starting to install the device.
Make sure there are no electricity cables or similar at the desired
mounting location!
The device must only be used for fixed installations. The device must
be securely attached within a fixed installation.
Proceed as follows to mount the LED controller in a false ceiling or par-
tition wall:
Position the LED controller at the desired location.
Mark the drilling points using the openings of the mounting lugs
(B).
Select the appropriate screws and dowels.
Drill the holes according to the screw size and insert the dowels.
You can now mount the LED controller over the mounting brack-
ets using the screws (fig. 2).
]
2
]
2
Start-up
29

Publicidad

loading