NOTE: Save the carton and these Installation Instructions for future reference. The carton is the best
way to store unit during winter, or when not in use.
PREPARE THE WINDOW
-8,000 btu units, and 15-1/2" (394mm) high for 10,000 – 12,000 btu units. Side louvers and the rear of the
unit must be outdoors, not inside a building or garage.
a.
3/4" or 1/2" Screws (7)
b.
Frame Lock (2)
(For Wooden windows)
c.
Lock Frame (2)
(For Vinyl-Clad windows)
d.
Sash Lock (1)
e.
Window Sash Seal
Foam (1)
f.
10" x 3/4" x 1-1/2"
Weather Stripping (5)
g.
3/8" Screws (4)
h.
Top Rail (1)
i.
R1 Hardware (2)
NOTE: Weather stripping is only for Energy star models.
PREPARE THE AIR CONDITIONER
1.
Remove the air conditioner from the
2.
Remove top rail (h) and R1 hardware (i)
from the packaging material as shown in
Figure 5. (R1 hardware is only included
for Energy star models.)
3.
Align the holes in the top rail (h) with
those in the top of the unit as shown in
Figure 6.
4.
Secure the top rail (g) to the unit with
the 3/8 Screws (g) as shown in Figure 7.
NOTE: For safety reasons, all four(4)
screws MUST be securely fastened.
NOTE: The top rail hardware and Figure
5, Figure 6 and Figure 7 are not applicable to
the units with more than 10000Btu/h. Before
installing unit, the top rail must be assembled
on the unit (For <10000Btu/h models only).
Mounting Hardware
a
b
Top Rail Hardware
g
Packaging
Top Rail
14
c
d
h
Figure 6
The rear of the
Figure 4
e
f
i
Figure 5
R1 Hardware
(<10000 BTU/h
models only)
R1 Hardware
(≥10000 BTU/h
models only)
Figure 7

Publicidad

loading

Este manual también es adecuado para:

Nprac8kewmz1Nprac10kewmz1Nprac12kewmz1