ASSEMBLY INSTRUCTIONS
7. Hang Vertical Standards (C) to Horizontal Top
Track (A) as shown.
8. Insert Left & Right Arm Brackets (F&E) into the
Vertical Standards (C) at desired shelf heights. Each
shelf requires 1x Left Arm Bracket (F) and 1x Right
Arm Bracket (E).
NOTE:
Arm Brackets are stamped with
L and R for easy identification
as well and an "UP" orientation
arrow.
PRO TIP
For easier alignment of the
arm brackets, slide all vertical
standard to the center of the
horizontal top track and install
all arm brackets at your
desired height.
7
2x
8
2x
F
9
A
C
C
E
F
2x
E
E
F