SECTION 6: CHECK & TEST
1.) Recheck all the wiring work, make sure all connections are tight and correct to this
manual.
2.) Switch on the power supply to the unit.
3.) On the control box switch the ON/OFF switch to the ON position.
4.) Using the wall controls, test all the functions to ensure they are correctly working.
If any functions do not work correctly recheck the wiring using sections 4 and 5
of this guide.
5.) Use the remote control to operate the unit, check all the functions.
Now the unit has been correctly wired.
6.) Slide the switch on the control box to the OFF position.
7.) Switch off the power supply to the unit.
SECTION 7: WALL FINISH
Finish wall construction work. Refer to figure 6 in section 3 for reference.
SECTION 8: COMPLETION
1.) Remove the protective film from the front frame of the unit.
2.) Open the slide panel brick box and identify left panel & right panels.
3.) Mount the side panels into the unit. The panels have magnets on the back that
hold the panels in place (see figure 12.)
4.) Open stone box and clean the stones. Place both the clear and white stones on the
shelf, mixing the two stone types evenly (see figure 12.)
5.) Securely holding the frame, line up the 3 pins on front frame with the holes on the unit.
Insert the pins into the holes and carefully lower the frame; the frame will seat down
into place (see figure 13.)
6.) Secure the frame with 2 screws.
Figure 12
stones
side panel
screws
pins
E-9
Figure 13