Descargar Imprimir esta página

Dongcheng DZC05-26B Instrucciones De Operación página 7

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Vibration information
Vibration total vales (triax vector sum) and uncertainty
K determined according to EN 60745-2-6.
a
= 18.932m/s²
uncertainty K= 1.5 m/s²
h,HD
a
= 14.471m/s² uncertainty K= 1.5 m/s²
h,CHeq
The declared vibration total value(s) and the declared
noise emission value(s) have been measured in
accordance with a standard test method and may be
used for comparing one tool with another.
The declared vibration total value and the declared
noise emission value(s) may also be used in a
preliminary assessment of exposure.
A warning:
− that the vibration and noise emissions during actual
use of the power tool can differ from the declared
values depending on the ways in which the tool is
used especially what kind of work piece is processed ;
and
− of the need to identify safety measures to protect the
operator that are based on an estimation of exposure
in the actual conditions of use (taking account of all
parts of the operating cycle such as the times when
the tool is switched off and when it is running idle in
addition to the trigger time).
Intended use
This product is suitable for drilling, slotting, chisel and
other work activities on concrete, rock, brick walls
and other similar materials under such environmental
conditions.
FUNCTION INSTRUCTIONS
1
2
3
4
1.Locking Sleeve
2.Dust Cap
3.Depth Gauge
6
5
4.Auxiliary Handle
5.Operating Mode
Selector
6.Switch
INSTRUCTIONS FOR OPERATION
Setting Operating Mode
Caution:
1.Always be sure that the tool is switched OFF
before changing the operating mode, or the
gears inside the tool maybe damaged.
2.If the drill bit gets stuck by the steel hidden
in the wall during impact drilling, and the tool
rotates due to the kickback, hold the handle
and auxiliary handle firmly to avoid personal
injuries.
The Operating mode can be changed by
turning the operating mode selector.
Drilling Operation
When impact drilling on the concrete or stone,
turn the selector to the position as shown in
the figure.(Left)
When normally drilling on the wood, metal,
ceramics or plastic, turn the selector to the
position as shown in the figure. (Right)
● Demolition Operation
When the position of chisel needs adjusting during
operation, turn the selector to the position as shown
in the figure to avoid gears from meshing and then
adjust the chisel.
After adjusting the chisel, turn the selector to the
position as shown in the figure to restart demolition
operation.
● Installing SDS-plus Hammer Drill Bit
SDS-plus hammer drill bit can be used when drilling
on the steel, wood or plastic. Screw the drill chuck in
the connecting rod and tighten the lock screw. Then
insert the connecting rod into the collect in the same
way as installing SDS-plus hammer drill bit.
SDS-plus hammer drill bit and drill chuck are optional
accessories.
EN
7

Publicidad

loading

Productos relacionados para Dongcheng DZC05-26B

Este manual también es adecuado para:

Azc05-26bKzc05-26b