01. Prepare the tools and accessories
The required installation tools are: tapeline, pencil,
horizontal ruler, screwdriver, drilling machine.
①
④
A Screws
M6 x 60mm 4pcs
B Gasket 4pcs
C Expansion wall plug 4pcs
03. Mark and drill pilot holes on the wall
Determine the height you want. Place basin against the wall.
Use a level to make sure both sides are level. Mark location
and drill on wall for mounting holes.
05. Secure the basin to the wall with screws
Finally, align and fix the basin with anchors on the wall.
③
②
⑤
E A set of Bracket 2pcs
D Anchors
M8 x 60mm x 2pcs
(132077 / 132079)
M8 x 60mm x 4pcs
(132081 / 132083 / 132085)
D
01 INSTALLATION OF A MOUNTING BASIN
02. Prepare Basin
Holes on basin were predrilled for brackets and screws.
04. Fix the mounting bracket
Put the corresponding mounting bracket in the position
of the bracket hole, mark screw hole drilling position
with a pencil, install the accessory screws, tighten the
bracket.
06. Install accessories
Install accessories like faucet and drainage separately.
D
A B C E
02