Descargar Imprimir esta página

Kohler K-10666 Instrucciones De Montaje página 6

Ocultar thumbs Ver también para K-10666:

Publicidad

Idiomas disponibles

Idiomas disponibles

Large Tube Nut
Coupling Nut
Escutcheon
Fiber Washer
Rubber Seal
2. Complete the Installation
For K-10673 and K-10674 Only
Place the vacuum breaker into the tailpiece.
Place the fiber washer onto the vacuum breaker.
Slide the large tube nut over the bottom of the tailpiece, then
tighten it to the valve body with a strap wrench.
Slide the coupling nut, escutcheon, fiber washer, and rubber seal
over the end of the tailpiece.
Hand tighten the inlet arm nut to secure the valve body to the
control stop.
Align the tailpiece with the spud, then slide the escutcheon over
the spud.
Hand tighten the coupling nut to the spud.
Vertically align the valve body with the control stop.
Using a strap wrench, tighten the valve body to the control stop
and the coupling nut to the spud.
For K-10666 and K-10677 Only
Using a strap wrench, tighten the valve body to the control stop
and the large tube nut to the vacuum breaker.
For All Installations
Remove the tape covering the sensor eyes.
1108709-2-B
Valve Body
Inlet Arm
Nut
Control
Fiber
Stop
Washer
Vacuum
Breaker
Tailpiece
6
Kohler Co.

Publicidad

loading

Este manual también es adecuado para:

K-10673K-10674K-10677