HOW TO ASSEMBLE
THE HANDLE
Install Upper Handle
1. Remove the T−knobs and U−bolts
from the lower handle (Figure 2).
2. Put the upper handle in the operat-
ing position.
3. Install the U−bolts and tighten the
T−knobs.
Note: Make sure that the cable is not
pinched between the upper and lower
handle. Make sure the cable is routed
as shown in Figure 2.
Attach Auger Drive Cable
1. Attach the auger drive cable to the
auger drive lever using the Z-hook
(Figure 3).
Adjust The Upper Chute
1. Remove the T−knob and bolt on the
upper chute (Figure 4).
2. Rotate the upper chute to the operat-
ing position (past the lower chute
stop).
3. Install the bolt and tighten the
T−knob.
Add Engine Oil
1. The snow thrower was shipped with a
container of 5W30 engine oil. Before
operating, add this oil to the engine .
2. Remove the oil fill cap/dipstick ac-
cess panel.
3. Remove the oil fill cap/dipstick
(Figure 5). Fill to the FULL mark on
the oil fill cap/dipstick. Periodically
check the oil level. DO NOT OVER
FILL.
Add Fuel
1. Fill the fuel tank with
fresh unleaded fuel.
2. To extend the life of the fuel and
prevent starting problems, add the
fuel stabilizer supplied with the
snowthrower. DO NOT OVER FILL.
1740309SM
ASSEMBLY
Upper
Handle
Lower Handle
Auger
Drive Lever
NOTE: Oil level must be at FULL mark.
8
Cable
T−Knob
Z-Hook
Upper Chute
Lower Chute
OIl Fill Cap/Dipstick
Figure 2
Figure 3
T−Knob
Figure 4
Figure 5